title | subtitle | author | summary | header-includes | ||
---|---|---|---|---|---|---|
Remodel Phase 2 (Doors) |
Richland Prefab 2BR |
John D. Fisher |
Proposed Phase 2 changes to the BR#1 and BR#2 doors. Collect plans for Phase 2 to be completed separatetly from the Phase 1 Kitchen, Living Room and Bedrooms. |
|
- Raise door jamb close to ceiling.
- Replace door. Frosted glass or similar synthetic material is desired to allow natural light into hall.
- Raise door jamb close to ceiling.
- Replace door with barn door. Frosted glass or similar synthetic material is desired to allow natural light into hall.
- Add cabinet door for closet.