Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

PTES land eligibility #299

Open
wants to merge 30 commits into
base: main
Choose a base branch
from
Open

PTES land eligibility #299

wants to merge 30 commits into from

Conversation

cpschau
Copy link
Contributor

@cpschau cpschau commented Dec 4, 2024

This PR adds a rudimentary land eligibility for pit thermal energy storage (PTES), that is used to introduce an upper bound for the maximum installable storage capacity within Germany. These upper bounds are introduced the district heating subnodes as well as for the mother nodes that comprise all currently existing district heating systems that are not explicitly represented by subnodes.

The land eligibility is based on the following assumptions (all criteria must be met):

  • PTES can only be built within the district heating systems that are contained within the Fernwärmeatlas
  • PTES can be located within the boundaries of the lower administrative units of the cities that are associated with these district heating systems
  • PTES can be built in areas of the following Corine land cover categories (configurable parameter): "Natural grasslands", "Sclerophyllous vegetation", "Beaches - dunes - sands", "Sparsely vegetated areas", and "Burnt areas"
  • PTES cannot be built within areas, which are protected according to NATURA 2000 dataset
  • PTES cannot be built in areas with a groundwater depth above -19 m underground. A geografically continuous global dataset of the groundwater depth is provided by Fan et al.. There should be a minimum distance between the storage ground and the groundwater of 3m.

The maximum installable capacity is calculated as conservative estimate, based on the geometric and techno-economic data of the existing PTES projects in Denmark: The geometric properties (surface area & depth) correspond to two of the largest projects in Denmark, namely SUNSTORE 2 & 3 (source for surface, source for depth). The energetic capacity of 4.5 GWh was taken from the PTES unit described in the DEA catalogue.

ptes_potential_germany
ptes_potential_groundwater

cpschau and others added 30 commits July 30, 2024 12:36
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants