Skip to content

Move Linux deps install #196

Move Linux deps install

Move Linux deps install #196

Triggered via push November 29, 2024 18:14
Status Failure
Total duration 7m 24s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 2 warnings
GHC 9.10.1 on ubuntu-latest
Process completed with exit code 1.
GHC 9.10.1 on macos-latest
Process completed with exit code 1.
GHC 9.10.1 on windows-latest
Process completed with exit code 1.
GHC 9.10.1 on macos-latest
pcre2 10.44 is already installed and up-to-date. To reinstall 10.44, run: brew reinstall pcre2
GHC 9.10.1 on macos-latest
Formula mysql-connector-c was renamed to mysql-client.