Skip to content

Tests

Tests #1414

Triggered via schedule October 25, 2023 01:18
Status Failure
Total duration 3h 37m 44s
Artifacts 1

ci.yaml

on: schedule
Matrix: Unit tests
Build charms  /  ...  /  Get workflow version
3s
Build charms / Get workflow version / Get workflow version
Build charms  /  Collect charms
14s
Build charms / Collect charms
Matrix: Build charms / build
Matrix: integration-test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
backup-integration | 2.9.45
Process completed with exit code 1.
database-relation-integration | 3.1.5
Process completed with exit code 1.
backup-integration | 3.1.5
Process completed with exit code 1.
ha-self-healing-integration | 2.9.45
Process completed with exit code 1.
tls-integration | 3.1.5
Process completed with exit code 1.
ha-self-healing-integration | 3.1.5
Process completed with exit code 1.
tls-integration | 2.9.45
Process completed with exit code 1.
db-relation-integration | 2.9.45
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 120 minutes.
db-relation-integration | 2.9.45
The operation was canceled.

Artifacts

Produced during runtime
Name Size
charms-packed-with-cache Expired
32.9 MB