Performace Improvement on the run CLI(ersilia-os#1299) #290
tests_and_cleanup.yml
on: pull_request
run-pytest
3m 0s
test-colab-notebook
2m 47s
update-model-request_template
4s
Matrix: install-ersilia
Matrix: test-docker
Matrix: test-os
Annotations
10 errors
test-docker (3.10)
Process completed with exit code 1.
|
test-docker (3.9)
The job was canceled because "_3_10" failed.
|
test-docker (3.9)
Process completed with exit code 1.
|
test-docker (3.11)
The job was canceled because "_3_10" failed.
|
test-docker (3.11)
Process completed with exit code 1.
|
test-docker (3.8)
The job was canceled because "_3_10" failed.
|
test-docker (3.8)
The operation was canceled.
|
test-docker (3.7)
The job was canceled because "_3_10" failed.
|
test-docker (3.7)
The operation was canceled.
|
run-pytest
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
output-cli.ipynb
Expired
|
5.07 KB |
|