chore: update dependency rimraf to ^5.0.10 #16033
Triggered via pull request
October 23, 2024 14:22
Status
Failure
Total duration
1h 27m 39s
Artifacts
–
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
6m 4s
Code Lint
7m 50s
Commit Lint
5m 58s
Verify Docs
6m 12s
Post-Test
0s
Annotations
2 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|