Skip to content

Separate mmcif_files from obsolete channels #636

Separate mmcif_files from obsolete channels

Separate mmcif_files from obsolete channels #636

Triggered via pull request January 21, 2025 15:12
Status Failure
Total duration 2m 59s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

18 errors and 2 warnings
Run pipeline with test data (24.04.2 | docker | test_esmfold)
Process completed with exit code 1.
Run pipeline with test data (24.04.2 | docker | test_alphafold2_download)
Process completed with exit code 1.
Run pipeline with test data (24.04.2 | docker | test_alphafold2_split)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (24.04.2 | docker | test_alphafold2_split)
Process completed with exit code 1.
Run pipeline with test data (24.04.2 | docker | test_colabfold_webserver)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (latest-everything | docker | test_split_fasta)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (24.04.2 | docker | test_colabfold_local)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (24.04.2 | docker | test_colabfold_download)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (latest-everything | docker | test_alphafold2_download)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (latest-everything | docker | test)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (24.04.2 | docker | test_split_fasta)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (latest-everything | docker | test_colabfold_download)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (latest-everything | docker | test_esmfold)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (latest-everything | docker | test_colabfold_webserver)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (latest-everything | docker | test_colabfold_local)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (latest-everything | docker | test_alphafold2_split)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (24.04.2 | docker | test)
The job was canceled because "_24_04_2_docker_test_te_7" failed.
Run pipeline with test data (24.04.2 | docker | test_esmfold)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Run pipeline with test data (24.04.2 | docker | test_alphafold2_download)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636