Skip to content

Small fixes and reduced verbosity for setup #17

Small fixes and reduced verbosity for setup

Small fixes and reduced verbosity for setup #17

Triggered via push January 13, 2025 09:31
Status Cancelled
Total duration 2m 10s
Artifacts 6

eval.yml

on: push
Matrix: eval
Fit to window
Zoom out
Zoom in

Annotations

18 errors
eval (verus)
The run was canceled by @JonasAlaif.
eval (verus)
The operation was canceled.
eval (verus)
Process completed with exit code 2.
eval (smt-comp)
The run was canceled by @JonasAlaif.
eval (smt-comp)
The operation was canceled.
eval (smt-comp)
Process completed with exit code 2.
eval (silicon)
The run was canceled by @JonasAlaif.
eval (silicon)
The operation was canceled.
eval (silicon)
Process completed with exit code 2.
eval (dafny)
The run was canceled by @JonasAlaif.
eval (dafny)
Process completed with exit code 2.
eval (dafny)
The operation was canceled.
eval (fstar)
The run was canceled by @JonasAlaif.
eval (fstar)
Process completed with exit code 2.
eval (fstar)
The operation was canceled.
eval (carbon)
The run was canceled by @JonasAlaif.
eval (carbon)
The operation was canceled.
eval (carbon)
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
carbon
180 Bytes
dafny
178 Bytes
fstar
178 Bytes
silicon
182 Bytes
smt-comp
184 Bytes
verus
178 Bytes